The “Mr Ting” crew were back together for a second film, and this time, planning and restraint was stressed and a better film was produced. The premise was that a weather phenomenon makes time slow in Aberystwyth and that the only way to solve the issue was to drain the sea. Responsibilities Director of Photography Editor Musical Editor